Taman Beringin Landfill Pond

PROPOSED RECOVERY AND REUTALIZATION THE SOLID WASTE DISPOSAL SITE OF TAMAN BERINGIN LANDFILL, KUALA LUMPUR 

Client: Cypark Sdn Bhd
Products used: HDPE Geomembrane, Geosynthetic Clay Liner
Year: 2006

During rainfall, the dumped solid wastes receive water, and the by-products of their decomposition move into the water through waste deposition. The liquid, containing innumerable organic and inorganic compounds, is called “leachate.” This leachate accumulates at the bottom of the landfill, percolates through the soil, and reaches the groundwater. Thus, to limit migration of the leachate Cypark has appointed Huls Engineering to supply, deliver and install subjected geosynthetic materials and responsilibities for the design and build for this project.